Johnson Engineering provided construction engineering & inspection (CEI), as well as constructability review services, for the new intersection improvements at Gateway Boulevard and Griffin Drive in Fort Myers.
This project included drainage and utility improvements, roadway reconstruction and rehabilitation and most notably, a center fountain. Existing traffic was maintained throughout construction to minimize the impact to the traveling public. Our team worked closely with Lee County, the contractor, and the Engineer of Record to assist in the development of a logical phasing plan. Constructability reviews conducted by Johnson Engineering resulted in both cost and time savings to the project by utilizing existing material on the project to the greatest extent possible. This project was recently completed ahead of schedule and under budget.
Modern roundabouts have seen a tremendous uptick in recent years, as they slow vehicles down, reduce idle time, and keep traffic continually moving, maximizing both safety and efficiency.
For more information contact John Glenn, PE at [email protected].