Johnson Engineering completed the design for the widening of Burnt Store Road in Cape Coral from 2-lanes to 4-lanes, from Pine Island Road (SR 78) to NW 5th Terrace. This segment of roadway was designed to be expandable to a future 6-lane roadway and serves as a hurricane evacuation route. Construction of the roadway was recently completed, and a ribbon cutting was hosted by the City of Cape Coral and Lee County on April 27, 2023.
Our team provided the roadway and drainage design for the corridor, along with all associated permitting. In addition, we provided street lighting and landscaping design for a portion of the roadway from Pine Island Road (SR 78) to Delilah Drive, along with signal improvements at the intersection of Pine Island Road to accommodate new turn lanes. The project also included one mainline bridge which provides pedestrian access underneath the roadway.
For more information contact Ryan Bell at [email protected].